|
Home > Technology Center > Engineering Committees > P-10 Committee Minutes
of P-10 Committee on Integrated Passive Devices
Self-introductions
were made. Attendance was taken,
and it was determined that a quorum was present. The attendance roster
and the CTA roster are in process of being updated to reflect the most
current members present. All attendees verified the correctness of the
information on the rosters. A meeting quorum pool is defined as those members eligible to vote at a meeting: a) If a voting member is not represented at two consecutive meetings and the absence continues for the subsequent meetings, the member shall be removed from the Meeting Quorum Poll for the subsequent meetings. Upon attendance at a subsequent meeting the member shall be reinstated in the Meeting Quorum Poll and have full voting privileges at that meeting. 2.2 Approval
of Agenda 2.3 Approval of October, 2000 Meeting Minutes Add Michael Griffith and Karen Lin to members present. The Committee unanimously accepted the revised Minutes of the last meeting. A list of active P-10 Committee projects will be attached to the minutes. Action Item 2.4 Correspondence No correspondence. 3.0 Old Business PN- 4944 was balloted
on a 30 day EIA paper ballot. The results of the ballot were discussed. 3.2 Review IPD Circuit Registration Requests 10 registration
proposals submitted with samples from California Micro Devices and KOA
Speer. Samples will be archived by ECA. 3.3 IPD Chip Scale Package Test / Qualification Requirements Status Sub-committee formed, lead by Scott Brown, to prepare Chip Scale Package Test Qualification Specification for next meeting. Request a PN number. Action Items 4.0 New Business
Pin 1 orientation exemption to EIA-783 guidelines for IPD's has been agreed to by the ACH committee, and will be included in the revised version of EIA-783 to be published shortly. 4.2 Five Year Document Review. SP-4815 is now EIA-850. Active project list should be updated. Action Item PN-1644, "Calculation of Component Defectiveness" is not recognized as a P-10 project. Motion: - To remove
PN-1644, "Calculation of Component Defectiveness" from the
P-10 active project list. 5.0 Next Meeting The next meeting will be at the 3rd Engineering Summit 10/8-10/2001 in Philadelphia at the Loews Hotel. 6.0 Adjournment The Committee moved, seconded, and unanimously agreed to adjourn at 5:40 PM. 7.0 Action Items P-10 active project list - Attach to minutes. Balloted RC Test Performance Specification with revisions - To EIA publications department for EDEC approval. EIA 30 day ballot - 10 IPD circuit registration proposals received. Chip Scale Package Test / Qualification Requirements - Sub-committee to draft a specification for next meeting. SP-4815 is now EIA-850 - Update active project list. Remove PN-1644 from the P-10 active project list. This meeting was
conducted in accordance with the EIA legal guidelines and the manual
of organization and procedures. Paul Krystek, Chairman Michael Tinkleman,
Secretary
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |